Categories | Table Formwork |
---|---|
Model Number: | Lifting fork |
Place of Origin: | Beijing, China (Mainland) |
Brand Name: | ZULIN |
Certification: | ISO9001-2008 |
Price: | Negotiation |
MOQ: | One 20ft container |
Delivery Time: | After deposit 15-20 days |
Payment Terms: | T/T L/C (bank transfer) |
Supply Ability: | 100sets/day |
Packaging Details: | In bulk,pallet,bundle or according the customer demand |
Lifting fork with bearing load 1 - 1.5T for lifting table formwork units
Descrition:
Lifting fork is used for lifting table formwork units. All connection pins must be inserted into the correct holes before working. Lifting fork is able to reposition table formwork units easily and reliably on the construction site.
which means it is not allowed for hoisting any other tools or equipment. For purpose of the stability of formwork unit, two prongs shall be forked between the main beams. If it is inconvenient to do so, they may support the main beams directly, in which case, the main beam and prong cross each other. However, this kind of situation should always be avoided. When concrete pouring finishes,lift the table formwork unit to an upper floor.
|