Home > Formwork >

Auto Self Climbing Formwork with power hydraulic system QPMX-50

Categories Self Climbing Formwork
Model Number: QPMX-50
Place of Origin: Beijing, China (Mainland)
Brand Name: ZULIN
Certification: ISO9001-2008
Price: Negotiation
MOQ: One 20ft container
Delivery Time: After deposit 15-20 days
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 100sets/day
Packaging Details: In bulk,pallet,bundle or according the customer demand
  • Product Details
  • Company Profile

Auto Self Climbing Formwork with power hydraulic system QPMX-50

Auto Self Climbing Formwork with power hydraulic system QPMX-50

Descrition:

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder
and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately,
so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is fast and safe.

Structure


The Characteristics
1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is reduced

while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are greatly reduced.


Standard Climbing Process
1.Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and formwork

to the right position, match the formwork and do the second pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4.Match the formwork to the right position and do the third pouring.
5.Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7.Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.



Illustration of Verticle Climbing


Sketches of inclined climbing 



Project Application


Project Name:City of Lights C10a (Abu Dhabi, UAE)

Contractor:CSCEC
ZULIN Products in Use:QPMX-50, Auto-climbing Protection Panel PS50


Applications:


Project Name:Haerbin Songpu Bridge (China)

Builder:LONGJIAN ROAD & BRIDGE CO.,LTD










































Product Tags:

slip form formwork

  

climbing formwork

  
Quality Auto Self Climbing Formwork with power hydraulic system QPMX-50 wholesale
Send your message to this supplier
 
*From:
*To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
You may also be interested in :
Inquiry Cart 0
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    Contact Us Quickly